LER 95-013-01:on 950905,FW flow transient was lost due to personnel error.Performed engineering evaluation of RPV thermal transient. LER 95-013-01:on 950905,FW flow transient was lost due to personnel error.Performed engineering evaluation of RPV thermal transient.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020