Notice of violation from insp on 940904-1015.Violations noted:licensee had not verified within last 18 months that EDG could energize swing HPSI pump 2P-89C through all time delay relay contacts during simulated LOOP. Notice of violation from insp on 940904-1015.Violations noted:licensee had not verified within last 18 months that EDG could energize swing HPSI pump 2P-89C through all time delay relay contacts during simulated LOOP.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020