Jump to main content

PNO-II-95-073:on 951225,unit 1 manually tripped from 100% power due to loss of control of main turbine generator exciter in progress.Licensee formed event investigation team to evaluate problem. PNO-II-95-073:on 951225,unit 1 manually tripped from 100% power due to loss of control of main turbine generator exciter in progress.Licensee formed event investigation team to evaluate problem.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020