Permanent installation of Unit 4 residual heat removal cooling system, residual heat removal cooling sea water system and emergency diesel generator cooling system Permanent installation of power panel (P/C 4D-2) has been completed on March 23, 2012 Photo taken on March 23, 2012 Permanent installation of Unit 4 residual heat removal cooling system, residual heat removal cooling sea water system and emergency diesel generator cooling system Permanent installation of power panel (P/C 4D-2) has been completed on March 23, 2012 Photo taken on March 23, 2012
Data source
Fukushima Nuclear Accident Archive (Japan Atomic Energy Agency)
This archive by the Japan Atomic Energy Agency enables search and browse of information from the websites of the Tokyo Electric Power Company, national and local governments, research institutes etc. ...
Last updated
March 22, 2021