Permanent installation of the generators of the residual heat removal system cooling systems (A and C) in Unit 2 Seawater Heat Exchanger Building (November 28) Trial operation [Permanent operation completed on November 28, 2012] (Photo taken on November 28, 2012) Permanent installation of the generators of the residual heat removal system cooling systems (A and C) in Unit 2 Seawater Heat Exchanger Building (November 28) Trial operation [Permanent operation completed on November 28, 2012] (Photo taken on November 28, 2012)