Insp repts 50-259/94-21,50-260/94-21 & 50-296/94-21 on 940912-16.No violations or deviations noted.Major areas inspected:emergency operating procedure follow-up insp & unit 3 control room design review. Insp repts 50-259/94-21,50-260/94-21 & 50-296/94-21 on 940912-16.No violations or deviations noted.Major areas inspected:emergency operating procedure follow-up insp & unit 3 control room design review.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020