Amend 111 to license DPR-80,revising AOT in TS 3/4.8.1.1, Electrical Power Sys,to allow operation of unit 1 in mode 3 (Hot Standby) during replacement of non-safety-related auxiliary transformer 1-1,for one-time extension to 48 hrs. Amend 111 to license DPR-80,revising AOT in TS 3/4.8.1.1, Electrical Power Sys,to allow operation of unit 1 in mode 3 (Hot Standby) during replacement of non-safety-related auxiliary transformer 1-1,for one-time extension to 48 hrs.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020