Jump to main content

LER 96-010-00:on 960411,failed to previously identify dependency between RHR minimum flow valve & cross powered RHR pumps.Caused by failure to recognize impact of power configuration on LOCA analysis.W/960509 ltr. LER 96-010-00:on 960411,failed to previously identify dependency between RHR minimum flow valve & cross powered RHR pumps.Caused by failure to recognize impact of power configuration on LOCA analysis.W/960509 ltr.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020