Jump to main content

CO/SUB 2/ ACCEPTOR PROCESS GASIFICATION PILOT PLANT: PLANT OPERATIONS FINAL REPORT. FINAL REPORT, VOLUME 12: BOOK 3 OF 4, JANUARY 1972-OCTOBER 1977. CO/SUB 2/ ACCEPTOR PROCESS GASIFICATION PILOT PLANT: PLANT OPERATIONS FINAL REPORT. FINAL REPORT, VOLUME 12: BOOK 3 OF 4, JANUARY 1972-OCTOBER 1977.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

August 15, 2022